Electrical Installation

Date of Installation: 10th October, 1997 (Fabrics Unit), 12th May, 2006 (Metal Unit).

Date of Last Review: 1st Sept, 2010 (Fabrics Unit), 12th October, 2010 (Metal Unit).

Isolation of Electricity in the Factories :

Main Supply: 75mm Heavy Duty - Copper insulated cable.

Supply inside Factories: No loose wiring inside the Factories.

Generators: Heavy duty generators, enough to run factories in the absence of power backup.

Alternate Power Backup: Inverters are available in both the factories as an alternate power backup.

Plugs: Propper Switches installed within the factories.

Circuit Breakers: Propper Circuit Breakers installed in the factories.

     